Offshore Wind
References

Deutsche Bucht Offshore Wind Farm | OHVS
North Sea, Germany
2019
Deutsche Bucht Offshore Wind Farm | OHVS

The JV Iemants-Eiffage is in charge of the engineering, procurement, construction and installation (EPCI) of the topside and jacket for the Deutsche Bucht offshore wind farm. Iemants is to cover the  steel constructions, architectural outfitting, sea fastening and load out of the topside plus the steel construction, sea fastening and load out of the jacket. Our partner CG is responsible for the HV/MV, while Eiffage is in charge of the LX/AUX.

 

Project data:

  • Client: Van Oord OWP Germany GmbH
  • Weight of topside: 2,720 tons (gross weight)
  • Weight of jacket: 1,760 tons